Client/Engineer: Syska Hennessy Group
Owner: United Parcel Service (UPS)
Services Provided: Cost Estimating, Cost Management
United Parcel Service (UPS) - Cooling Tower Replacement
Mahwah, NJ
Ellana provided cost estimating services for electrical upgrades associated with the replacement of two (2) cooling tower plants. The project scope included replacing the towers’ covers consisting of six (6) and four (4) cells each. Work included the removal and disposal of the existing equipment, piping and insulation; site preparation; installation of the new cooling tower plants, which were purchased directly by UPS; the furnishing and installation of fans and heaters; all required piping, supports, valves; heat tracing; automatic controls; and required inspections.