Ellana provided cost estimating services for the adaptive re-use of a 210,000-square-foot private school on the West side of Manhattan for Avenues - The World School. The conversion transforms a warehouse building and to support classrooms, administrative and play areas for children from early childhood to elementary, middle and high school ages.

Ellana prepared comprehensive estimates, participated in value engineering exercises, and performed cost-benefit analysis for a variety of potential design options.

Nick Allen, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Completion: 2019

Services Provided: Cost Estimating

Bedford High School Renovation + John Glenn Middle School Additions & Alterations

Bedford, MA

In a continued partnership working with this design team on projects for the Town of Bedford we provided consulting services for improvement projects at two separate schools in town. Our work consisted of the concurrent cost estimating for an addition at the middle school and alterations to the high school. We assessed the costs of the designs at both the 50% CD and 100% CD milestones. 

The middle school project involved the construction of an addition to address the school's capacity issue and involved all typical trades. The town was also interested in the modernization of the existing middle school as well as the rebuilding of the school's parking lot. For the high school project, the team designed various interior renovations amounting to roughly 7,400 SF. The design of the middle school addition included a brick and glazed curtain wall facade system, a new surveillance system, and ample new classroom space. Apart from working with a tight budget from the owner, there were no particular challenges to either project. 

Beyond My Ken, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: Berkeley Carroll School

Completion: 2019

Services Provided: Cost Estimating, Cost Management

Berkeley Carroll School Feasibility Study

Brooklyn, NY

Ellana provided cost estimating services for a multi-phased renovation in which the school and two adjacent buildings will be renovated and conjoined into the existing structure. The renovation provides the proper space for the schools growth with the addition of several new classrooms, administration offices, and support spaces.

Owner: Boston School District

Completion: 2019

Services Provided: Cost Estimating 

Boston Public School - Jackson / Mann School 

Boston, MA

Ellana provided cost estimating services for the conceptual planning of a complete interior gut & fit out of an existing K-8 school just outside Boston, MA. The 220,000 SF project included gut demolition and abatement, new MEP systems, partitioning, and associated finishes, equipment, and furnishings. The building envelope was to be reclad, replacement windows, and a new roof system.

Owner: Bridgeton NJ Public School District

Completion: 2024

Services Provided: Cost Management, Cost Estimating

Bridgeton High School

Bridgeton, NJ

This K-12 project includes 69,500 SF addition to the existing Bridgeton High School and program driven renovations of 7,100 SF. The addition features new spaces to support an Early College High School education program, classrooms, labs, student services suite, gymnasium, and related support areas. Renovations include the construction of a new larger nurse’s suite in the existing student services area and a new life skills lab in place of a group of existing undersized classrooms. The project allows for the additional capacity of 326 student seats in grades 9-12.

Ellana provided cost estimates for this project. Our estimates include pricing for HVAC upgrades, finishes, fixed cabinetry, life safety systems, communications, electrical service to accommodate technology, concrete, roofing, fume hoods, and sitework.

Owner: Brooklyn Friends School

Completion: 2011

Services Provided: Project Scheduling, Cost Estimating

Brooklyn Friends School Renovation & Expansion

Brooklyn, NY

Ellana assisted with the strategic expansion of Brooklyn Friends School. In addition to opening the new Family Center at Brooklyn Friends at 189 Schermerhorn Street, BFS is undertaking the renovation of classrooms and corridors on the second, sixth and seventh floors at 375 Pearl Street. This work will provide classrooms to accommodate the additional sections of first grade (as of 2011-12) and second grade (as of 2012-13) as outlined in the BFS Strategic Plan. There will be 8,634 SF of space renovated at 375 Pearl Street and 4,752 SF of new construction at 189 Schermerhorn Street Brooklyn Friends School is an Independent Quaker School for Students serving grades PreK-12 since 1867.

Owner: NYCEDC

Completion: 2023

Services Provided: Cost Management, Cost Estimating

Department of Education, Vernon Building

Long Island City, NY

ELLANA is performing cost estimating of existing studies for reprogramming the existing industrial-based building. Project includes master planning work and review of scope under previous studies

Owner: NYC School Construction District

Completion: Ongoing

Services Provided: Cost Management, Cost Estimating

Franklin K. Lane Educational Campus Electrical Upgrades - H.S. 420

Brooklyn, NY

Franklin K. Lane Educational Campus, also known as H.S. 420, is the site for six different high schools: Academy of Innovative Technology, Brooklyn Lab School, Cypress Hill Prep Academy, Urban Assembly School for Collaborative Healthcare, Multicultural High School and Uncommon Leadership Charter High School.

IMEG oversaw the design of extensive mechanical and electrical upgrades at the 388,262 SF facility featuring electrification, heat pump systems, and low-voltage electrical system service.

Ellana prepared cost estimates for this eight-story rehabilitation project. In addition to the electrical and HVAC pricing, our experts also provided estimates of the building renovation work needed to accommodate these improvements.

Swampyank, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: RIDE

Completion: 2018

Services: Cost Estimating, Cost Management

North Smithfield Elementary and High School Addition and Renovations

North Smithfield, RI

ELLANA provided a feasibility/SD estimate for adding 4 additional classrooms to the existing NSSD primary school. Our scope included modifications and connection sto the existing building and ancillary road work to the existing site. For the NSSD High School, ELLANA provided a feasibility/SD estimate for complex science laboratories, a locker room and related facilities within the original 1930’s High School. Alternative schemes were priced for this project.

NSSD had two independent requirements for this project. The primar y school needed additional classrooms, best provided by the addition of advanced modular units and extending the existing MEP systems. For the much older High School bui lding, an extensive upgrade for the science laboratories was required. This included reconfiguration of the teaching spaces and laboratories, renovation of the MEP systems, and provision of modern laboratory hoods and HVAC capability. In addition the project required renovation and upgrades in sports facilities bathroom areas.

Rendering Courtesy of TLBA

Owner: MSBA

Completion: 2022

Services: Cost Estimating, Cost Management

New Canaan High School, Dunning Stadium

New Canaan, CT

Ellana is providing cost estimating for a new expansion to a stadium and heavy surrounding site work inprovements. The project calls for demolition of adjacent buildings and redevelopment of parking and visitor areas. The project includes complex multi-disciplinary interface to optimize layouts to concessions, radio and private boxes and suites, and the expanded stadium facilities.

Mrp1221, CC BY 3.0 <https://creativecommons.org/licenses/by/3.0>, via Wikimedia Commons

Owner: RIDE

Completion: 2019

Services Provided: Cost Estimating - Master Planning

RIDE Pilgrim and Toll Gate High Schools Master Plan

Warwick, RI

Ellana provided cost estimating consultant service at master planning stage for construction of new and renovation of existing projects at Pilgrim and Toll Gate High Schools. The estimates provides costs for several projects and options for projects with a variety of programming. Work included additions, building systems relocation and replacemetn, new facilities, roofing repair and site improvements to facilitate collaboration and community, in support of master planning goals.

Owner: City of Quincy/Quincy Public Schools

Completion: 2027

Services: Cost Estimating, Cost Management

Squantum Elementary School

Quincy, MA

Squantum Elementary, the City of Quincy’s newest school, preserves its 1919 façade in a nod to the past while introducing flexible teaching spaces in daylight-filled classrooms. Educational areas include library, special education, art, and music classrooms, therapy rooms, a 2,500 SF media center, gym, and cafeteria.

The 79,801 SF school features a two-story building and basement as well as sitework for a three-acre lot that includes a playground and an outdoor classroom. A net zero energy usage goal is planned.

Ellana provided cost estimating and reconciliation services for this project. Our estimates included phasing considerations, existing building demolition & abatement, and 12 geothermal wells.

Rendering Courtesy of Goody Clancy

Owner: The St Mark’s School

Completion: 2019

Services: Cost Estimating

The St. Mark’s School Residence Hall

Southborough, MA

Cost estimating for a new residence hall for The St. Mark’s School, a private boarding school. This brand new, three-story, 80,000-square-foot residence hall will feature single and double bedrooms for students and prefects, as well as apartment space for faculty and their families. The full project scope also includes new site amenities such as a viewing pavilion built into the hill that overlooks the school’s football field, new parking areas, and new outdoor circulation and communal spaces for the students. Design on the new residence hall is expected to finish in spring of 2019.

Success Academy Charter Schools, Public domain, via Wikimedia Commons

Owner: Success Academy Charter Schools

Completion: 2023

Services: Cost Estimating

Success Academy Charter Schools - 120 Wall Street

New York, NY

Success Academy Charter Schools is a growing charter school operator in New York City with 49 locations in the Bronx, Brooklyn, Manhattan, and Queens. One of the school’s goals is to enroll 10,000 more students in the next five years. Incorporated in 2006, Success Academy remains well known for its high test scores and 100 percent acceptance rate to four-year colleges and universities.

Ellana prepared a budget cost estimate for the 17,500 SF, three-floor tenant fit out at the Success Academy Charter School at 120 Wall Street in Manhattan. The scope of work included interior demolition, structural work for new stairs, MEP, finishes, and partitions. The estimate was fast-tracked through workshops and required Ellana to respond quickly to deliver the estimate.

Jim.henderson, CC BY-SA 4.0 <https://creativecommons.org/licenses/by-sa/4.0>, via Wikimedia Commons

Owner: The Dalton School

Completion: 2023

Services Provided: Cost Management, Cost Estimating

The Dalton School Expansion, Assessments and Master Plan

New York, NY

Ellana’s relationship with The Dalton School under Zubatkin’s representation, spans a decade, and began with a Master Plan and assessments in 2013. The team provided cost alternatives for a variety of options and building systems, and developed a strategic approach to renovate and expand its campus across the next ten years.

In 2019, Ellana provided cost estimating and cost management services for the two-story, 12,000-square-foot overbuild and expansion, which included the renovation of five existing floors and 92,000 square feet, that features a Science, Technology, Engineering, Arts and Math (STEAM) center at the top of the building. Renovations included stuctural modifications, reinforcements, MEP and HVAC system upgrades and tie-ins to the new addition. Ellana also performed value engineering costing to meet project budget targets.

In 2023, Ellana and DLR Group began a new phase of campus planning to ensure Dalton meets it particular programming goals, and to build community across administrators, faculty, staff and students through a planned engagement process, enhance sustainability practices, and balance security with a welcoming campus environment, consistent with Dalton’s mission.

The work includes cost estimates for various facility condition assessments that detail existing of MEP/FP, Envelope/Façade/Roofing, Elevators, and Life Safety systems, alongside recommendations for short- and long-term improvements. The project also includes cost analysis of a sustainability assessment that plans for compliance with impending stringent energy laws, and recommends short- and long-term goals.

Owner: Massachusetts School Building Authority

Completion: Ongoing

Services Provided: Cost Management, Cost Estimating

Tri-County Vocational Technical High School

Franklin, MA

Tri-County’s mission is to provide an excellent comprehensive technical and academic education to regional high school students. The new 280,000 SF Tri-County Regional Vocational Technical High School will be a modern, flexible, and sustainable educational facility. The new school will be built in the current solar field behind the existing school.

The three-story building is organized around a large courtyard with the main entrance providing direct access to the Student Commons, which also serves as the cafeteria and the lobby for the gym and auditorium. The career technical shops are grouped in career clusters and located near general academic classrooms, allowing the program flexibility to be organized into small learning communities.

Ellana’s cost estimates included masonry, aluminum & glass curtain wall, insulated metal panels, and insulated precast concrete panels.